15km from Freemantle WA, the HMAS Stirling naval base on Garden Island is connected to the mainland by a 4km causeway which is now in need of some repair. Damian Beausang of Celtic Scaffolding designed this scaffold that was built from the top down by first spurring out and then cantilevering back in. This was achieved "without the use of any beams or tube and couplers" reports Damian.
Thank you to Damian Beausang from Celtic Scaffolding Pty Ltd for the use of this photo.
Celtic Scaffolding website: www.celticscaffolding.com.au

