Celtic Scaffolding built this birdcage for the Perth Metro Rail Project, Esplanade station. The birdcage
enabled Leighton Kumagai Joint Venture to do work on the inside of the roof.
Celtic Scaffolding needed to span across access voids to the lower platform, which was a tricky job,
especially with concrete columns in the way.
They erected 17 3.07m bays within the specified type time
frame, keeping ahead of the contractors who were following behind. This was Celtic's first job using
Layher scaffolding.
Thanks to Damian Beausang of Celtic Scaffolding for the use of this photo.
Celtic Scaffolding website: www.celticscaffolding.com.au

