Instant Access provided this tiered under bridge access system for the surface preparation and coating of two adjacent bridges that cross the State Highway 1 motorway leading into Wellington, New Zealand.
Brad Leggett, Wellington Branch Manager for Instant Access NZ Ltd, said that they decked out with 3.07mē Allround bays, spanning the 14.5m underside of the bridges with Layher 750mm aluminium lattice girders. The whole set up was supported from the top by counterweighted rigs constructed out of SpeedyScaf frames.
Thank you to Brad Leggett of Instant Access NZ Ltd for the use of these photos.
Instant Access New Zealand website: