In May 2009 the four yearly major maintenance shutdown was completed at Anglesea Power Station. CGE Hire built a 1700mē scaffold within the furnace to provide full access to the hearth, water-wall tubes and platen elements.

"CGE Hire successfully completed the design, supply and installation of this scaffold, the first time that this task had been achieved in the 40+ year existence of the station," said William Dempsey, AHEA Shutdown Team Leader. Significant design challenges were met to assure structural integrity of the complete scaffold-furnace assembly by installation of an external support strut system.

In addition, late challenges to the layout of the system caused by greater than expected distortion of hearth and water-wall geometry were successfully catered for with minimal disruption to progress of serial shutdown repair requirements.

Thank you to John Onley, Managing Director of CGE Hire Pty Ltd for the use these photos.
CGE Hire Pty Ltd website: www.cgehire.com.au


Download PDF


pdficon Shutdown Maintenance
Scaffold (0.6 MB)



Links to Layher products


Layher scaffolding
with more possibilities



Buy Layher scaffolding

Purchase these and more genuine Layher scaffolding products by contacting your local Layher representative

Recent Featured Jobs

Heliport Temporary Roof
Harbour Bridge Scaffold
Scaffold Eurovision Style
Shopping Centre Scafoholic
Channel 10 Studios Scaffold

Tauranga Bridge Scaffold
Crane Scaffold
Offshore Scaffold
Brazier's Crowning Scaffold
Homegrown Scaffold

Suspended Scaffold
Falsework Scaffold
Refinery Scaffold
Drill Rig Scaffold


 
RSS feed - Layher ScaffoldingYouTube - Layher ScaffoldingTwitter - Layher ScaffoldingDelicious - Layher ScaffoldingDelicious - Layher Scaffolding